A
-
Amiri, M.
APPLICATION OF RESPONSE SURFACE METHODOLOGY AND FUZZY REGRESSION METHOD TO DETERMINE OPTIMUM AMOUNT OF EFFECTIVE FACTORS IN VEHICLE BRAKE DRUM ASSEMBLING PRO? [دوره 1-27, Issue 1, 2011, Pages 133-143]
-
Arbabi, H.
THE REALITY OF A PROJECT MANAGEMENT OFFICE FOR CONSTRUCTION ORGANIZATION IN THE OIL, GAS, AND PETROCHEMICAL INDUSTRY OF IRAN [دوره 1-27, Issue 1, 2011, Pages 55-63]
-
Arbabshirani, B.
GENERATING AN INCORPORATED BALANCED SCORECARD (BSC) AND FUZZY ANALYSIS NETWORK PROCESS MODEL (FANP) (CASE STUDY: ISFAHAN MUNICIPALITY) [دوره 1-27, Issue 1, 2011, Pages 65-73]
-
Asgharizadeh, E.
EVALUATION OF THE COMPETENCY OF INDUSTRIAL EQUIPMENT MANUFACTURERS IN THE OIL INDUSTRY, USING PROMSORT [دوره 1-27, Issue 1, 2011, Pages 39-45]
-
Aslani, S.
GENERATING AN INCORPORATED BALANCED SCORECARD (BSC) AND FUZZY ANALYSIS NETWORK PROCESS MODEL (FANP) (CASE STUDY: ISFAHAN MUNICIPALITY) [دوره 1-27, Issue 1, 2011, Pages 65-73]
D
-
Darab, B.
DESIGN OF AN E-LEARNING READINESS ASSESSMENT MODEL FOR IRANIAN UNIVERSITIES [دوره 1-27, Issue 1, 2011, Pages 21-30]
F
-
Farajian, M.
EXPLORING THE EFFECT OF HUMAN AND SOCIAL CAPITAL ON MANAGER CAREER SUCCESS (CASE STUDY: MELLAT BANK [دوره 1-27, Issue 1, 2011, Pages 3-9]
-
Fattahipoor, F.
OPTIMAL INSPECTION INTERVALS AND CONTROL LIMITS IN CONDITION-BASED MAINTENANCE [دوره 1-27, Issue 1, 2011, Pages 103-111]
-
Fazel, M.
PARTICLE SWARM OPTIMIZATION FOR EXTENDED PORTFOLIO SELECTION PROBLEM [دوره 1-27, Issue 1, 2011, Pages 113-125]
G
-
Ghezel Arsalan, M. R.
MAKE TO ORDER, MAKE TO STOCK, SELECTION MODEL IN A COMBINED SYSTEM [دوره 1-27, Issue 1, 2011, Pages 47-53]
-
Golmakani, H.R.
OPTIMAL INSPECTION INTERVALS AND CONTROL LIMITS IN CONDITION-BASED MAINTENANCE [دوره 1-27, Issue 1, 2011, Pages 103-111]
-
Golmakani, H.R.
PARTICLE SWARM OPTIMIZATION FOR EXTENDED PORTFOLIO SELECTION PROBLEM [دوره 1-27, Issue 1, 2011, Pages 113-125]
H
-
Hasanzadeh Mofrad, M.
ROBUST OPTIMIZATION OF A PORTFOLIO WHICH INCLUDES OPTIONS [دوره 1-27, Issue 1, 2011, Pages 93-102]
-
Hajikarimig, A.A.
EXPLORING THE EFFECT OF HUMAN AND SOCIAL CAPITAL ON MANAGER CAREER SUCCESS (CASE STUDY: MELLAT BANK [دوره 1-27, Issue 1, 2011, Pages 3-9]
J
-
Jafarian, M.
A MULTI-OBJECTIVE P-HUB MEDIAN PROBLEM CONSIDERING QUEUE UNDER FUZZY ENVIRONMENT [دوره 1-27, Issue 1, 2011, Pages 11-19]
-
Jolai, F.
MAKE TO ORDER, MAKE TO STOCK, SELECTION MODEL IN A COMBINED SYSTEM [دوره 1-27, Issue 1, 2011, Pages 47-53]
K
-
Kashef Haghighi, M.A.
THE REALITY OF A PROJECT MANAGEMENT OFFICE FOR CONSTRUCTION ORGANIZATION IN THE OIL, GAS, AND PETROCHEMICAL INDUSTRY OF IRAN [دوره 1-27, Issue 1, 2011, Pages 55-63]
-
Khayyambashi, E.
GENERATING AN INCORPORATED BALANCED SCORECARD (BSC) AND FUZZY ANALYSIS NETWORK PROCESS MODEL (FANP) (CASE STUDY: ISFAHAN MUNICIPALITY) [دوره 1-27, Issue 1, 2011, Pages 65-73]
M
-
Mahluji, H.
PREDICTING THE PERFORMANCE OF A PRODUCTION PROCESS BASED ON LOGISTIC REGRESSION AND ARTIFICIAL NEURAL NETWORKS (CASE STUDY: TILE SPRAY DRYING [دوره 1-27, Issue 1, 2011, Pages 31-38]
-
Modarres, M.
ROBUST OPTIMIZATION OF A PORTFOLIO WHICH INCLUDES OPTIONS [دوره 1-27, Issue 1, 2011, Pages 93-102]
-
Montazer, G.A.
DESIGN OF AN E-LEARNING READINESS ASSESSMENT MODEL FOR IRANIAN UNIVERSITIES [دوره 1-27, Issue 1, 2011, Pages 21-30]
N
-
Neshat, N.
PREDICTING THE PERFORMANCE OF A PRODUCTION PROCESS BASED ON LOGISTIC REGRESSION AND ARTIFICIAL NEURAL NETWORKS (CASE STUDY: TILE SPRAY DRYING [دوره 1-27, Issue 1, 2011, Pages 31-38]
-
Nazari, A.
THE REALITY OF A PROJECT MANAGEMENT OFFICE FOR CONSTRUCTION ORGANIZATION IN THE OIL, GAS, AND PETROCHEMICAL INDUSTRY OF IRAN [دوره 1-27, Issue 1, 2011, Pages 55-63]
-
Nekooeimehr, N.
GENERATING AN INCORPORATED BALANCED SCORECARD (BSC) AND FUZZY ANALYSIS NETWORK PROCESS MODEL (FANP) (CASE STUDY: ISFAHAN MUNICIPALITY) [دوره 1-27, Issue 1, 2011, Pages 65-73]
P
-
Pourghannad, B.
AN INTEGRATED SUPPLY CHAIN MODEL FOR THE SUPPLY UNCERTAINTY PROBLEM [دوره 1-27, Issue 1, 2011, Pages 127-132]
R
-
Rasti, S.
A SIMULATED ANNEALING ALGORITHM FOR SEQUENCE-DEPENDENT PROBLEMS INVOLVED IN FLEXIBLE
FLOW SHOP GROUP SCHEDULING [دوره 1-27, Issue 1, 2011, Pages 75-91]
S
-
Sajadifar, M.
AN INTEGRATED SUPPLY CHAIN MODEL FOR THE SUPPLY UNCERTAINTY PROBLEM [دوره 1-27, Issue 1, 2011, Pages 127-132]
-
Shavandi, H.
A MULTI-OBJECTIVE P-HUB MEDIAN PROBLEM CONSIDERING QUEUE UNDER FUZZY ENVIRONMENT [دوره 1-27, Issue 1, 2011, Pages 11-19]
-
Salmasi, N.
A SIMULATED ANNEALING ALGORITHM FOR SEQUENCE-DEPENDENT PROBLEMS INVOLVED IN FLEXIBLE
FLOW SHOP GROUP SCHEDULING [دوره 1-27, Issue 1, 2011, Pages 75-91]
-
Shokatpour, M.
EVALUATION OF THE COMPETENCY OF INDUSTRIAL EQUIPMENT MANUFACTURERS IN THE OIL INDUSTRY, USING PROMSORT [دوره 1-27, Issue 1, 2011, Pages 39-45]
T
-
Torabi, A.
A MULTI-OBJECTIVE P-HUB MEDIAN PROBLEM CONSIDERING QUEUE UNDER FUZZY ENVIRONMENT [دوره 1-27, Issue 1, 2011, Pages 11-19]
Your query does not match with any item